Explore Mossy

Turn a tenant’s repair call into a useful work order

Capture the details a property team needs to act.

All blog posts

A report of a leak needs more than the word plumbing. Capture the address, what the tenant can see and how the team can arrange access. Follow the property team’s own escalation rules for urgent reports.

Check whether an open repair already exists. If the caller is chasing progress, add the update to that repair instead of creating a separate job. Keep each case tied to the right property and owner.

Before sending a contractor, review priority, access and authorisation. Tell the tenant what will happen next and avoid offering a date that has yet to be agreed. The team should be able to see the latest status the next time someone calls.

Capture what the tenant can observe

Ask the tenant to describe what they can see and where the problem appears. A clear note might say that water is pooling below the radiator in the front bedroom and the tenant will be home after four. Capture the address and a callback number in fields the maintenance team can search. An issue description should preserve enough detail for a staff member to decide how to respond without asking the tenant to diagnose the fault.

Agree which situations go straight to the emergency contact under your existing policy. Make sure the fallback applies outside office hours and when a staff queue is unavailable. Test the path with the people who cover the rota. Keep instructions within what the property team has approved for callers and route questions needing specialist judgement to the responsible person.

Keep access and scheduling visible

The right contractor can still be delayed if nobody knows how to gain access. Ask who can attend, the preferred window and any arrangements the contractor needs to know about. Store only the access detail necessary for the job and share it with the people who need it. Confirmation should be tied to a real appointment recorded by the team.

Check previous repair records before starting a new one. The tenant may be calling about a temporary repair or an order already with a contractor. Add new information to the existing case when it belongs there, so both the contractor and the tenant receive consistent updates. If the record cannot be matched reliably, mark it for manual review.

Use the next tenant call to test the handover

Imagine the tenant calls the following day. The person answering should be able to identify the job, check whether an appointment is agreed and explain the next step. A note saying someone will call back is only useful if it identifies who owns the call and when the tenant should expect it.

Review a sample of completed and open repairs with the property team. Count duplicate work orders, missing access information and follow-ups that never reached the tenant. Look for issues across the whole path, from intake to contractor scheduling. Agree which field or status to change and have the team check the same measure in the next review.

Close the repair with a clear record

When a contractor marks the visit complete, record what was done, whether a second visit is required and what the tenant was told. If the contractor could not get access, keep the reason distinct from a completed repair. This detail saves the property team from reopening the whole job history when a tenant calls again or a different colleague takes over.

Explore related Mossy features

Cookie preferences

Essential storage remembers your choices. Optional analytics measure site use.